From rough idea to a finished board.
You tell us what the system needs to do. VoltCraft turns that into a practical architecture, component list, board layout and finished bench-built assembly.
Clear decisions before parts get mounted.
Good power systems are easier to build when the assumptions are settled early.
- STEP 01
Project intake
Application, loads, battery, charging sources, inverter needs, available space and budget.
- STEP 02
System architecture
We define the voltage, protection strategy, main components, current paths and expansion needs.
- STEP 03
Quote + build
Once the equipment and scope are approved, the board is laid out, fabricated, labeled and configured.
- STEP 04
Handoff
You receive the board, equipment and project documentation for final integration by you or your qualified installer.
Five things to send with your request.
Exact answers are not mandatory. Reasonable estimates are enough to begin.
Loads
Watts/amps of the biggest 120V device plus the daily 12/24V loads.
Battery
Existing or desired chemistry, voltage and amp-hour capacity.
Charging
Solar wattage, alternator/DC-DC, generator or shore power.
Space
Approximate mounting width × height and any depth/ventilation limits.
Existing parts
Brand and model numbers of any equipment you already own.
Integration stays on your side of the line.
VoltCraft’s work ends with the standalone assembly and supply package. We do not travel to the RV, shack, vehicle or building to perform the final installation.
- Customer / installer mounts the assemblyPhysical mounting, environment and clearances are confirmed at the final location.
- Final field wiring is completed on siteBattery, PV, alternator, shore/generator and load connections are made at the application.
- Trade/permit requirements remain site-specificUse an appropriately qualified person and obtain permits/inspection where required.
Ready to turn your parts list into a system?
Start with the quote form. We’ll use your answers to define the next step.